The consortium of China Railway 18th Bureau Group and China Railway Construction Electrification Bureau Group will construct phases 1 and 2 of the network, which have a total length of 74.3km and a maximum design speed of 100km/h.

CRCC says the award is subject to fulfillment of all conditions specified in the letter of intent from the financing bank and final approval by the president of Nigeria.