The 52.2km line will include a 13.5km underground section and 38.7km of viaduct with 39 stations.

Arup will carry out reference design on all 10 underground stations, together with all other operational buildings and structures. It will also assist MRT with tendering for the underground construction package, including the preparation of tender documents, evaluation of technical submissions from bidders, and carrying out design and technical reviews.