With the opening of the three-station extension, traffic on Line 1 is expected to reach 560,000 passengers per day by 2016.

Peak services operate at nine minute intervals on the extension and every 10 minutes at other times.

The opening of the extension takes the total length of Line 1 to 34.5km with 28 stations.