The facility will maintain all types of ICE and is due to be completed in time for the introduction of the new ICx fleet in 2017.

The depot will employ up to 400 staff and is designed to be carbon neutral, with a 16,000m2 photovoltaic system covering the roof and geothermal power for heating and cooling.