Lot 1 comprises 78 250km/h trains, which will be supplied in eight batches by CSR Sifang. Lot 2 comprises 180 350km/h sets, and is divided between CNR Changchun (27 trains), CSR Sifang (83 trains) and CNR Tangshan (70 trains).

The total value of the two lots is reportedly around Yuan 44bn ($US 7.3bn).