The two-axle 60km/h 36-tonne locomotives will be equipped with digital control systems, remote diagnostics, multiple control systems and wheel-slide protection. The locomotives will be equipped with a CAT C13 328kW engine.

The contract is worth Koruna 239m ($US 10.7m) and the locomotives will be delivered by February 2019.