The 6.4MW multi-system (1.5kV/3kV dc and 15kV 16.7Hz/25kV 50Hz ac) locomotives will be equipped with ETCS Level 2 and certified for operation in Germany, Austria, and Italy.

Assembly will be carried out at Siemens' plant in Allach, Munich.