Two types of locomotive have been ordered: 25 are 140km/h units to haul passenger trains and the remainder will be for freight operation with a maximum speed of 120km/h. The two versions will have maximum outputs of 1864kW and 2610kW.

PR has suffered a chronic shortage of locomotives in recent years, which has led to a decline in freight and passenger traffic.