The prototype locomotive will now start California Air Resources Board’s 3000-hour in-service verification testing, initially operating on the 29km the Pacific Harbor Line which serves the ports of Los Angeles and Long Beach.

The four-axle 1.49MW locomotive has been remanufactured using an EMD GP-40 and is equipped with a Caterpillar 3512C HD power unit with exhaust gas aftertreatment.