The lines are:
• RB 73 Pritzwalk - Neustadt (Dosse)
• RB 74 Pritzwalk - Meyenburg

 

Closing date for bids is February 6 2018. The 10-year concession will start in December 2018 and covers 23,000 train-km per year.

VBB will consider more than just the financial offer when considering bids. Special attention will be paid to proposals which include vehicles with propulsion systems designed to reduce CO2 emissions and other exhaust gases.

Battery-powered trains or vehicles which run with either reduced gas emissions or without any kind of emission are preferred, with a view to introducing such trains during the period of concession.