Designed by Bombardier teams in Brazil, the United States, and Spain, the new system will allow trains to operate at minimum headways of 75 seconds on the existing 8.4km, six-station line and on the 11.6km, 11-station extension from Largo 13 to Capão Redondo, which is due to open in 2015 and will be served by 34 trains.