Faiveley will design and produce HVAC equipment for driver’s cabs and passenger compartments, taking into account the restrictive loading gauge of the S-Bahn network.

Engineering of prototypes and type testing will be carried out at Faiveley’s facility in Berlin, while the equipment will be manufactured at the company’s site in Plzen, Czech Republic.

Deliveries will take place between 2017 and 2023, with options under the framework contract extending until 2029.