Bombardier will design, install, test and commission the signalling system as well as supply its EBI Lock 950 R4 computer-based interlocking, EBI Screen 2000 centralised traffic control system, and EBI Gate 2000 level crossing system. The project is scheduled to be completed by October 2015.