Wabtec will supply its Interoperable Electronic Train Management System (I-ETMS) for 42 locomotives and driving cars, a back-office server, wayside communications and signalling, and a dispatch system. The supplier will also be responsible for training and system integration.

Installation will be completed by the end of 2018 and the system will be fully interoperable with the PTC systems being rolled out by the Class 1 freight railways.