Hollysys will provide automatic train protection (ATP) equipment for installation on 200km/h and 300km/h trains currently on order. It will also supply ground-based train-control centre (TCC) signalling equipment.

 

Together, these two systems form what Hollysys describes as the critical elements of a high-speed railway signalling system.