ProRail

SEVERAL managers of Dutch railway infrastructure manager Prorail have been forbidden from taking part in tendering procedures for track maintenance contracts.
Traditionally contacting sensors and survey devices have been used to measure track displacement during construction on or close to track infrastructure. However, Arthur Kappers, switch systems specialist at Prorail, and…
DUTCH infrastructure manager Prorail is to reduce track access charges for lightweight multiple units following a ruling by the Consumer and Markets Authority (ACM) that the current level of pricing…
THE Dutch secretary of state for infrastructure Mrs Wilma Mansveld, who is responsible for railway affairs, informed parliament on June 25 of irregularities by the national infrastructure manager Prorail in…
THE Dutch province of Overijssel and infrastructure manager Prorail have awarded Volker Rail, Netherlands, a contract to electrify the 40km Zwolle – Wierden line.
A new course in Railway Technology offered by HU University of Applied Sciences Utrecht and developed with industry partners is aiming to encourage young people to enter railway engineering. Roepesh…
At the start of this year new 10-year concessions came into effect for infrastructure management and operation of passenger services on most of the Dutch railway network. Quintus Vosman considers…
DUTCH secretary of state for infrastructure Mrs Wilma Mansveld signed 10-year concession agreements on December 15 with Netherlands Railways (NS) for the operation of the so-called core network and with…
THE installation of ERTMS on the Betuweroute dedicated freight line between the port of Rotterdam and the German border was finally completed on December 8, when the section between Zevenaar,…
TRIAL operation began on the new underground rail link beneath the Dutch city of Delft on November 1, when a Netherlands Railways (NS) VIRM EMU carried a group of journalists…
Start
Prev
1
Page 1 of 3