The $US 44.4m order was placed in August 2014 and financed with the aid of a $42.2m loan from China's Exim Bank.

The 120km/h locomotives have a nominal output of 7.2MW and are equipped with microprocessor control, asynchronous traction motors, and a remote diagnostics system.