Indonesia studies HS line
The Ministry of Transport has appointed Japan Railway Technical Service (Jarts) and Yachiyo Engineering to conduct a pre-feasibility study for a public-private partnership scheme to build a 144km 210km/h line between Jakarta and Bandung.
Trains using the existing 1067mm-gauge line take around 3 hours to complete the 173km trip.
The Ministry of Transport has appointed Japan Railway Technical Service (Jarts) and Yachiyo Engineering to conduct a pre-feasibility study for a public-private partnership scheme to build a 144km 210km/h line between Jakarta and Bandung.
Trains using the existing 1067mm-gauge line take around 3 hours to complete the 173km trip.
Categories: Asia, High-speed, News
Tags: 1 Highspeed, Indonesia, PPP