The line, which has a maximum speed of 200km/h, will reduce travel time between the two cities from six hours to two, with 19 stops along the route. Construction began in July 2014, with testing starting in May.

Services will be operated by CRH5A EMUs, adapted for operation in severe weather and high altitude, as the region can be hit with blizzards and temperatures as low as -40oC.