Shenyang Metro’s new underground line interchanges with the east-west Line 1 at Tiexiguangchang and the north-south Line 2 at Aotizhongxin, where it also connects with Shenyang’s tram network.

Shenyang Metro has trained 70 drivers to operate Line 9.

Line 9 will have 23 stations when Huanggutunzhan station opens at a later date. The minimum headway between trains is 6 minutes 46 seconds.

For detailed information on metro projects around the world, subscribe to IRJ Pro.