The project will be completed in mid-2015 and will extend the line by 4km with six new stations.

Both extensions are being built by a joint venture of Dycasa, Argentina, and Techint, Italy.

In the longer term a further two-station extension is planned to take Line H to an interchange with Line B and Line C at Retiro.