The €2m initiative includes preliminary studies for structures and buildings, final route alignment and track layout, detailed design, geotechnical studies, and the preparation of tender documents for the line, which will be designed for operation at up to 160km/h.

The studies are due to be completed by the end of 2015.

Kavala-map