Orange installed more than 200 trackside antennas along the route to ensure consistent levels of coverage along the entire 409km route, with the exception of two tunnels in the Paris suburbs.

Orange is planning to introduce 4G services across the remainder of the French high-speed network by 2018, starting with TGV Nord from Paris to Lille in July.