August 21, 2017

Trial operation starts on Nanchang Line 2

Written by 
  • Print
  • Email

TRIAL operation began on August 19 on the first 19.6km section of metro Line 2 in Nanchang, China, from Metro Central south to Nanlu.


The new line has 17 stations and interchanges with the 28.7km Line 1 at Metro Central and Nanching West station. The line is currently being extended east to Xinjia’an via a second interchange with Line 1 at Bayi Square and an interchange with Nanchang main station. The line will eventually be 31.7km long.

A syndicated loan for Yuan 22.5bn ($US 3.37bn) was signed on the same day to fund the construction of the 40km metro Line 4, which is due to open in 2021.

For more detailed information on Chinese metro projects subscribe to IRJ Pro.

Get the latest rail news

Global news and analysis from IRJ, Railway Age and RT&S by email