THE introduction of a greatly-expanded timetable on the cross-London Thameslink on May 20, which has seen a 13% increase in the number of trains operated each day, and the retiming of most services on the wider Govia Thameslink Railway (GTR) network, got off to a poor start with numerous train cancellations.